|
3D-Palace: The Cutty Sark for 3ds Max |
 From the initial setup of the ship, everything is carefully covered.
The Student is shown how to set up the splines that will eventually
form the keel, which is then surfaced up. The keel is split into a top
and bottom segment so that the top can have deck holes for draining
water added, then the deck is laid. The deck is then refined to its
three main heights and deck houses are added followed by additional
detail and yardarms, belaying pins, rope hooks and so forth.
|